SUMMARY:What happened: Postponed\, reported by Action News 5 (WMC) on 2026
 -10-06. Scheduled: Memphis City Council final vote on a twelve-month data
  center moratorium
LOCATION:Memphis\, Tennessee
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261006-1@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261006
DTEND;VALUE=DATE:20261007
SUMMARY:What happened: Decided\, reported by WUNC on 2026-10-07. Scheduled
 : Raleigh City Council public hearing on a six-month data center moratori
 um
LOCATION:Raleigh\, North Carolina
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261006-2@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261006
DTEND;VALUE=DATE:20261007
SUMMARY:What happened: Decided\, reported by Rockdale Citizen on 2026-10-0
 7. Scheduled: County commissioners vote on the Rockforge data center rezo
 ning
LOCATION:Rockdale County\, Georgia
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261008-3@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261008
DTEND;VALUE=DATE:20261009
SUMMARY:What happened: Decided\, reported by CBS Austin on 2026-10-08. Sch
 eduled: Taylor City Council vote on development agreement and annexation 
 for 664-acre Taylor Technology Campus (Big Watt Digital\, PowerHouse Data
  Centers)
LOCATION:Taylor\, Texas
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261009-4@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261009
DTEND;VALUE=DATE:20261010
SUMMARY:First part of the hearing on Hydro-Québec's proposed data center 
 rate is scheduled to end\; a second part is planned in December
LOCATION:Régie de l'énergie\, Quebec
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261012-5@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261013
SUMMARY:Next city council meeting\, when Mayor Coffman could call up the T
 rident data center
LOCATION:Aurora\, Colorado
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261012-6@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261013
SUMMARY:Deadline (5 pm) for data center developers to answer ERCOT's reque
 st for information covering 461 proposed data centers
LOCATION:ERCOT
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261012-7@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261013
SUMMARY:Requested effective date for the Large Load Registry and Interim R
 esource Adequacy Service\, ER26-3515
LOCATION:FERC / PJM
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261012-8@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261013
SUMMARY:Deadline to intervene in Liberty's large load customer rate plan r
 equest\, Case No. ET-2026-0184
LOCATION:Missouri Public Service Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261012-9@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261012
DTEND;VALUE=DATE:20261013
SUMMARY:South Bristol Town Board public hearing on proposed zoning law ban
 ning data centers\, 6 pm
LOCATION:South Bristol · New York · United States
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261013-10@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261013
DTEND;VALUE=DATE:20261014
SUMMARY:Town hall meeting on the proposed data center
LOCATION:Elizabeth Township\, Pennsylvania
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261013-11@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261013
DTEND;VALUE=DATE:20261014
SUMMARY:Common Council takes up the data center moratorium
LOCATION:Milwaukee\, Wisconsin
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261015-12@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Stakeholder comments due on the Large Loads Initiative draft final
  proposal and draft tariff language
LOCATION:California ISO (CAISO)
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261015-13@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Greensboro City Council data center work session
LOCATION:Greensboro · North Carolina
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261015-14@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Public hearing on whether the county should impose a 180-day morat
 orium on new data centers
LOCATION:Guilford County Board of Commissioners
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261015-15@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Formal consideration of extending the data center moratorium throu
 gh August 8\, 2027
LOCATION:Johnson County Board of Supervisors\, Johnson County
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261015-16@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Planning and Land Development Regulation Commission reviews propos
 ed ordinance banning large-scale data centers in unincorporated Volusia C
 ounty
LOCATION:Volusia County\, Florida
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261018-17@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261018
DTEND;VALUE=DATE:20261019
SUMMARY:Effective date for the Midcontinent Large Load Addition Resource S
 tudy pathway if federal regulators approve
LOCATION:MISO
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261019-18@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261019
DTEND;VALUE=DATE:20261020
SUMMARY:Stakeholder meeting to discuss the Large Loads Initiative draft ta
 riff language
LOCATION:California ISO (CAISO)\, virtual meeting
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261020-19@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Second public comment hearing\, 26AL-0137E\, Xcel large load tarif
 f\; evidentiary hearing October 21\, 22\, 26\, 27 and 28
LOCATION:Colorado PUC
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261020-20@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Council vote on the proposal restricting land for data centers
LOCATION:Hillsboro City Council
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261020-21@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Delayed vote on the temporary data center moratorium
LOCATION:Memphis City Council
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261020-22@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Spokane County commissioners hearing on a pause on land use and pe
 rmit applications for data centers\, 2 pm
LOCATION:Spokane County · Washington
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261020-23@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:St. Johns County public hearing on yearlong data center pause ordi
 nance
LOCATION:St. Johns County · Florida
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261020-24@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Volusia County Council second and final public hearing on large-sc
 ale data center ban ordinance
LOCATION:Volusia County\, Florida
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261021-25@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261022
SUMMARY:Public hearing and final vote on the one-year large data center mo
 ratorium ordinance
LOCATION:Grand Junction City Council
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261021-26@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261021
DTEND;VALUE=DATE:20261022
SUMMARY:Consideration of proposed tax breaks for the Metrobloks data cente
 r
LOCATION:Indianapolis Metropolitan Development Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261022-27@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261022
DTEND;VALUE=DATE:20261023
SUMMARY:Second reading of the remaining two data center items
LOCATION:Lexington-Fayette Urban County Council\, Kentucky
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261022-28@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261022
DTEND;VALUE=DATE:20261023
SUMMARY:Special Members Committee meeting on the reliability backstop proc
 urement
LOCATION:PJM Interconnection
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261023-29@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261023
DTEND;VALUE=DATE:20261024
SUMMARY:Comment date (5 pm ET) on Midcontinent Independent System Operator
  Large Load Addition Resource Study filing\, Docket ER27-25-000
LOCATION:Federal Energy Regulatory Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261026-30@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261026
DTEND;VALUE=DATE:20261027
SUMMARY:Alachua City Commission considers the 12-month data center morator
 ium ordinance again
LOCATION:Alachua\, Florida
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261026-31@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261026
DTEND;VALUE=DATE:20261027
SUMMARY:Piedmont City Council expected vote on Cloverleaf's Open Sky data 
 center infrastructure project
LOCATION:Piedmont · Oklahoma · United States
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261027-32@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261027
DTEND;VALUE=DATE:20261028
SUMMARY:Enid City Commission special meeting on Project Thunderbird data c
 enter rezoning\, 5 pm\, Stride Bank Center
LOCATION:Enid · Oklahoma · United States
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261028-33@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261028
DTEND;VALUE=DATE:20261029
SUMMARY:Board of Governors vote on the large load proposal
LOCATION:CAISO
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261029-34@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261029
DTEND;VALUE=DATE:20261030
SUMMARY:PJM proposal due in response to the Commission's decision on the b
 ackstop procurement
LOCATION:PJM Interconnection / Federal Energy Regulatory Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261031-35@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:Data center moratorium effective until October 31\, 2026
LOCATION:Lexington\, Kentucky
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261103-36@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261103
DTEND;VALUE=DATE:20261104
SUMMARY:Special Election for voters in Piqua\, where the city commission h
 as approved a data center
LOCATION:Piqua\, Ohio
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261103-37@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261103
DTEND;VALUE=DATE:20261104
SUMMARY:Ballot question on data centers in Trenton
LOCATION:Trenton\, Ohio
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261113-38@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261113
DTEND;VALUE=DATE:20261114
SUMMARY:Target order date in Pacific Power's large load (data center) rate
  docket under the POWER Act\; docket number not printed on the page
LOCATION:Oregon PUC
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261116-39@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261116
DTEND;VALUE=DATE:20261117
SUMMARY:Proposed data center regulations released for public comment
LOCATION:City of Raleigh
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261117-40@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261117
DTEND;VALUE=DATE:20261118
SUMMARY:Technical Conference on the allocation of costs associated with la
 rge computational loads
LOCATION:Pennsylvania PUC
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261124-41@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261124
DTEND;VALUE=DATE:20261125
SUMMARY:Temporary moratorium on new data center proposals and development 
 runs until this date
LOCATION:Hillsboro
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261202-42@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261203
SUMMARY:Requested effective date of Midcontinent Independent System Operat
 or Large Load Addition Resource Study (LARS)\, Docket ER27-25-000
LOCATION:Federal Energy Regulatory Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261210-43@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:ERCOT targets completion of the data center audit covering about 3
 00 projects of 75 MW or larger
LOCATION:ERCOT / PUCT
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261210-44@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:ERCOT plans to publish its report on the data center request for i
 nformation\, with the Public Utility Commission of Texas
LOCATION:ERCOT / PUCT
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20261215-45@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20261215
DTEND;VALUE=DATE:20261216
SUMMARY:Current data center approvals pause ends unless extended to June 2
 027
LOCATION:Spokane County\, Washington
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270101-46@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Most of seven new California data center laws take effect (page: '
 Most take effect January 1\, 2027')\, including SB 887 and AB 2469
LOCATION:California
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270101-47@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:New Pacific Power large load rates scheduled to take effect\; dock
 et number not printed on the page
LOCATION:Oregon PUC
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270128-48@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270128
DTEND;VALUE=DATE:20270129
SUMMARY:Commission expects to consider a Final Order on large load curtail
 ment procedures at its public meeting\, M-2026-3064961
LOCATION:Pennsylvania PUC
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270131-49@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:Date by which Liberty asks the Commission to issue an order approv
 ing its large load customer rate plan\, Case No. ET-2026-0184
LOCATION:Missouri Public Service Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270214-50@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270214
DTEND;VALUE=DATE:20270215
SUMMARY:Greensboro data center moratorium expires
LOCATION:Greensboro · North Carolina
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270406-51@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270406
DTEND;VALUE=DATE:20270407
SUMMARY:Final action on the Raleigh data center rules after the six-month 
 moratorium
LOCATION:Raleigh City Council
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270413-52@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270413
DTEND;VALUE=DATE:20270414
SUMMARY:City Council final decision on the data center\, postponed to the 
 April 13\, 2027 council meeting
LOCATION:Colorado Springs\, Colorado
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20270511-53@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20270511
DTEND;VALUE=DATE:20270512
SUMMARY:Eight-month moratorium on data centers in unincorporated areas exp
 ires
LOCATION:Lake County\, IL
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20271016-54@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20271016
DTEND;VALUE=DATE:20271017
SUMMARY:Data center moratorium remains in effect through this date (one-ye
 ar extension)
LOCATION:Indio\, California
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:loadpath-20280101-55@loadpath.energy
DTSTAMP:20261009T120000Z
DTSTART;VALUE=DATE:20280101
DTEND;VALUE=DATE:20280102
SUMMARY:Deadline for the CPUC to establish new tariffs or update electric 
 rules for data centers
LOCATION:California Public Utilities Commission
DESCRIPTION:Source: 
URL:
TRANSP:TRANSPARENT